MEGMEET Collaborating with NVIDIA to Develop 800 VDC Sidecar for NVIDIA AI Data Center Power Architecture
Release time:Oct 13, 2025

San Jose, USA – October 13, 2025 — MEGMEET, global leader in Power and Energy solutions, today announced that it is designing and manufacturing advanced power solutions including an 800 VDC data center architecture for NVIDIA MGX™ architecture. With AI workloads scaling rapidly, traditional 54 V DC rack-level power architectures are no longer sufficient. At OCP Global Summit, Megmeet displayed its 800 V designed to power mega-watt scale racks for the next generation of AI factories, supporting NVIDIA's 800 VDC data center.

                          

 

MEGMEET's 800 VDC is leading the transition to DC data center power infrastructure

MEGMEET is at the forefront of this transformation, engineering innovative 800 VDC power systems designed to:

· Enable rack-level power delivery beyond 1 MW

· Enable up to 5% improvement in end-to-end power efficiency

· Reduce copper usage by up to 45% compared to legacy systems

· Fully modular design enables flexible deployment across diverse rack configurations, supporting rapid scaling of AI workloads.

· Streamlined architecture and minimize space and cooling overhead including liquid-cooled options enhancing data center density, reliability, and energy efficiency.

By leveraging its decades of power conversion expertise and commitment to sustainability, MEGMEET is delivering fully modular, high-density DC power building blocks that will help unlock the full performance potential of AI data centers, while cutting total cost of ownership (TCO) by as much as 30%.

 

Collaboration with NVIDIA
As part of NVIDIA' s 800 VDC ecosystem, MEGMEET is actively contributing to the co-development and deployment of safe, scalable, and future-proof DC infrastructure.

 

Driving the Next Wave of Sustainable Compute
The next generation of AI data centers requires a fundamental transformation in energy infrastructure design to meet the scale, efficiency, and reliability demands of accelerated computing,” said Roya Movahedi, Chief Marketing Officer at MEGMEET. “By collaborating with NVIDIA to deliver DC solutions, MEGMEET is shaping a new era of scalable and sustainable energy systems for AI datacenters around the world.”

                                        800 VDC Distribution to payload racks and DC/DC conversion to 12 V for GPUs

 

About MEGMEET
MEGMEET is a $1.1B global leader in high-efficiency power solutions, engineered to empower a cleaner, more sustainable future. The company delivers innovative energy technologies for data centers, e-mobility, industrial automation and renewable energy. With R&D and manufacturing hubs across North America, India, Thailand, China, and Germany, MEGMEET combines global reach with deep technical expertise to drive the next generation of intelligent power infrastructure.

 

Media Contact:
Roya Movahedi
Chief Marketing Officer (CMO)
MEGMEET

rmovahedi@megmeet.com
https://en.megmeet.com/